![GB50551-2010球团机械设备安装工程质量验收规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/835/33688835/b_33688835.jpg)
9.6 Sealing Chute
Ⅰ Major Items
9.6.1 Countersunk screws fixing the sealing chute shall be lower than sliding surface of the chute.
Quantity checked:All.
Checking method:Check by observation.
9.6.2 Reserved gaps of respective parts in sealing chute for thermal expansion shall meet the requirements of design technical documents.
Quantity checked:All.
Checking method:Check installation quality records or by field tests.
Ⅱ General Item
9.6.3 Allowable deviation of sealing chute installation shall be in accordance with those specified in Table 9.6.3.Refer to Figure 9.6.3.
Quantity checked:All.
Checking method:Refer to 9.6.3.
Table 9.6.3 Allowable deviation of sealing chute installation(mm)
![img](https://epubservercos.yuewen.com/C62A70/18000635008205506/epubprivate/OEBPS/Images/txt009_15.jpg?sign=1739538220-8Xc96USn0UAudrwcMkXr727D2qmLiTm6-0-8ecb1d39f4f5c8921ab2d3f5eec8fae2)
![img](https://epubservercos.yuewen.com/C62A70/18000635008205506/epubprivate/OEBPS/Images/txt009_16.jpg?sign=1739538220-IIgjHnz2e5WxGwSVZhAScBO7go0EVFWj-0-23b37bdc9af76a3df941a12dd2d4c466)
Figure 9.6.3 Elevation measurement of sealing chute
1-Pallet rail;2-Sealing chute;3-Longitudinal center line of traveling grate equipment;4-Special sample rod for rail