6.13 Sealing Slide and Sealing Plate
Ⅰ Dominant Item
6.13.1 Countersunk-headed screw for fixing sealing slide must lower than sliding face of the slide.
Check quantity:to check all.
Inspection method:inspection.
6.13.2 Preset thermal expansion gap for every part of sealing slide,must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records or to take actual measurements.
Ⅱ General Item
6.13.3 Tolerance for installation of sealing slide shall meet requirements in Table 6.13.3,see Figure 6.13.3.
Examination:to check all.
Inspection method:see Table 6.13.3.
Table 6.13.3 Tolerance for installation of sealing slide
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_23.jpg?sign=1738940017-WHL3X7f98oGpowMf5ahhYZaqrtBvhgNO-0-00172dae6d3a33e573f7935cb1766086)
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_24.jpg?sign=1738940017-hjGE77e5L2nyTlj0kgUHGPVYanKG0nE3-0-01d4f7a620cd260d44cc7b4f9c064823)
Figure 6.13.3 To survey elevation of sealing slide
1-Trolley rail;2-Sealing slide;3-Longitudinal centerline of sintering equipment
6.13.4 Tolerance for installation of plate movable sealing plate shall meet requirements in Table 6.13.4.
Check quantity:to check all.
Inspection method:see Table 6.13.4.
Table 6.13.4 Tolerance for installation of plate movable sealing plate
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_25.jpg?sign=1738940017-yKIhliCUA4sZx0pwrfvhPcxdFOU1XyLb-0-391dba9f24f0a9760b7b8f2e746e030b)